First Article Inspection for Injection Molded Parts: What the FAI Report Must Show

Last Updated: October 19, 2026

Answer Capsule: A first article inspection (FAI) proves that a new or changed injection mold makes parts to print before production starts. The report must show every drawing dimension measured on a part from every cavity, the instrument used, the material certification, and the lot and cavity ID. Aerospace buyers require AS9102 Forms 1, 2 and 3.

You approved a new mold, the first shipment arrives, and the paperwork says “parts inspected, pass.” That is not a first article inspection. It is a promise. If one cavity runs 0.004 in oversize, you will find it on your assembly line, not on paper.

A thin or missing FAI report is how a scrapped lot or a late launch shows up months after the tool was approved. The fix is cheap. Know what a first article inspection must contain, and refuse to release production until you have it.

This guide covers when an FAI is required and what the report must show. It explains how AS9102 Forms 1 to 3 work for aerospace and defense buyers, and what a simpler FAI looks like for everyone else. It also lists the reports you should send back.

Brent Hanke, owner of Legacy Molding in Phoenix, ships an FAI report with every new or transferred tool. The examples here come from that shop floor.

What is a first article inspection in injection molding?

A first article inspection is a full dimensional and material check of the first parts off a new or changed mold, documented against the drawing. The molder measures every characteristic on the print and records the actual value next to the nominal and tolerance. You then approve the tool for production or send it back for steel changes.

The FAI is about the tool, not the lot. A lot inspection samples a shipment. An FAI qualifies the mold, the process setup and the material that will make every future lot. That is why the first article is tied to a specific cavity, a specific process sheet and a specific resin lot.

Legacy Molding treats the FAI as the handoff point. Until the report is signed on both sides, the job is still in tooling. After that, any change to the tool or the process gets flagged and re-checked.

When is an FAI required?

An FAI is required whenever something that can change the part has changed. That means a new tool, a transferred tool, a design change, a process or material change, a new molding location, or a two-year gap in production. These triggers come from AS9102, and they are a sound rule for any industry.

The events that call for a new or partial first article inspection:

  • New mold or new cavity. Every new tool, and every added or replaced cavity insert.
  • Transferred mold. The same steel in a different press, with a different setup, is a new process.
  • Design change. Any revision that affects fit, form or function. A partial FAI on the changed dimensions is common.
  • Process, material or inspection change. A new resin grade, a new gate, a new cycle, a new measuring method.
  • Lapse of two years. AS9102 calls for a full FAI when a part has not been made for two years or more.
  • An event that could affect the process. A flood, a fire, or a major press rebuild.

If you are moving a mold from a molder that is closing, insist on an FAI at the receiving shop before the first production order. Legacy Molding runs one on every transferred tool. The mold transfer process explains what to collect before the move.

What must an FAI report contain?

A usable FAI report contains a ballooned drawing, a results table with every characteristic measured per cavity, the instrument used, the material cert, and the lot and cavity ID. If any of those is missing, you cannot trace a future defect back to its cause.

Element What it shows Why you need it
Ballooned drawing Every dimension and note numbered Links each result to a print callout
Results table Nominal, tolerance, actual, pass or fail The numbers, not a checkbox
Cavity ID Which cavity made the measured part Multi-cavity tools fail one cavity at a time
Instrument Caliper, height gauge, pin gauge, optical comparator Tells you how good the number is
Material cert Resin supplier’s certificate for the lot used Proves the right material and grade
Process sheet Press, melt and mold temperatures, times, pressures The setup that made the parts
Signatures Molder’s inspector and your approver Makes it a record, not a note

Every cavity, every dimension. On a four-cavity tool you should see four columns of results, not one. Cavities were cut separately and wear separately, so they do not match. For very high cavity counts, a sampling plan agreed in writing is acceptable.

Instruments matter. Legacy Molding measures first articles with calibrated calipers, height gauges and pin gauges, and records the instrument next to each result. If your drawing has a dimension those tools cannot resolve, say so before tooling starts. Then you can agree on how it will be measured.

How do AS9102 Forms 1, 2 and 3 work?

AS9102 is the SAE aerospace standard for first article inspection, and it uses three forms. Form 1 covers part number accountability, Form 2 covers product accountability, and Form 3 covers characteristic accountability. If your customer is an aerospace or defense prime, your molder will likely be asked for all three.

  • Form 1, Part Number Accountability. Identifies the part, revision, drawing, purchase order, and whether the FAI is full or partial. For a partial FAI, the reason is recorded here.
  • Form 2, Product Accountability. Lists the raw material, special processes and functional tests, with certificate numbers. For a molded part, this is where the resin cert goes.
  • Form 3, Characteristic Accountability. The ballooned characteristics, each with design requirement, result, and the tool used. This is the heart of the report.

The current revision is AS9102C, published in 2023. Equivalent forms are usually allowed, so a molder’s own template is fine if it carries the same fields. You can read the standard’s scope on the SAE AS9102C page.

Not aerospace? You do not need the three-form format. A simpler FAI with the same content covers medical, electronics, industrial and consumer parts. Ask your molder what certifications they hold before assuming any paperwork is in place.

What should you reject in an FAI report?

Reject any FAI that reports “pass” without numbers, skips cavities, lacks a material cert, or uses a drawing revision that does not match your purchase order. Each of those is a sign that the report was written to close a job, not to qualify a tool.

Here is a call Legacy Molding gets most months. A buyer’s overseas molder shipped 20,000 housings with a one-page “inspection OK” sheet. Two cavities out of eight made a snap fit that cracks. Nobody can tell which two, because the parts were not cavity marked and the report had one column.

The buyer now sorts by hand and is shopping for a domestic molder to take over the tool. The red flags to send back:

  • A single column of results on a multi-cavity tool
  • “Pass” or a check mark with no measured value
  • No instrument listed, or every dimension measured with the same caliper regardless of size
  • No material certification, or a cert for a different grade than the drawing calls out
  • No cavity or lot number on the report or the parts
  • A drawing revision older than the one on your PO
  • No process sheet, so the setup cannot be repeated after a tool change

One more check: confirm the part has a cavity number molded in. Without it, the per-cavity results cannot be tied to a part in your hand.

How Legacy Molding runs a first article

Legacy Molding runs a first article on every new tool and every transferred tool before the first production order ships. The process starts with scientific molding setup. That way the parts measured come from a process the shop can repeat, not from a lucky shot.

The steps are the same every time:

  1. Balloon the current drawing revision and agree on the characteristic list with you.
  2. Set up the process, run the tool to a stable state, and pull one part from each cavity.
  3. Measure every ballooned characteristic with calibrated instruments, recording which one was used.
  4. Attach the resin supplier’s material cert and the lot number for the pellets used.
  5. Send the report with the sample parts for your approval before production starts.

The shop keeps lot traceability from that point forward. The page on production injection molding in Phoenix covers press range, lead times and in-process checks.

Frequently Asked Questions

What is the difference between FAI and PPAP?

An FAI proves that one part from a new or changed tool meets the drawing. PPAP is a larger submission package, common in automotive supply chains. It also documents the process behind the part, such as flow charts, control plans and capability studies. An FAI is usually one element inside a PPAP, so ask which elements a customer needs before you commit a molder to the full package.

How long does a first article inspection take?

A simple molded part with 20 to 30 ballooned characteristics on a single-cavity tool takes a few hours to measure and write up. A multi-cavity tool with 100 or more characteristics can take a day or more. The time depends on the number of characteristics, the number of cavities and the instruments needed. Ask your molder to quote the FAI time with the tooling lead time.

Who pays for the FAI?

Most molders include the first article inspection in the tooling or sampling charge for a new or transferred mold. Some customers write into the purchase order that FAI is supplied at no additional cost. Either way, get it in writing before the tool is cut.

Does a transferred mold need a new first article inspection?

Yes. A different press, a different setup and often a different resin lot mean the part can shift even though the steel is the same. AS9102 lists a change in location of manufacture as a trigger. Legacy Molding runs a full FAI on every tool it takes in before releasing production.

Conclusion

Three things to remember. A first article inspection qualifies the mold, not the shipment, so it must show every dimension from every cavity with real numbers. AS9102 Forms 1, 2 and 3 are required for aerospace and defense work, and the same content in a simpler format covers everyone else. A report with no numbers, no cert or no cavity IDs should go back to the molder.

Legacy Molding ships an FAI with every new or transferred tool from its Phoenix shop, with the cert, the cavity results and the process sheet attached. If you are vetting a new molder, the guide to choosing an injection molding supplier lists the questions to ask about inspection practice.

Send your CAD and annual volume for a quote with DFM notes, or call Brent at 480-256-9773.

Sources

Brent Hanke | Legacy Molding | 480-256-9773 | b.hanke@legacy-molding.com

Brent Hanke is the owner of Legacy Molding, a custom plastic injection molder in Phoenix, Arizona, producing parts for OEMs across the Southwest and the country.