Answer Capsule: Injection molding cost has two parts: a one-time mold and a per-piece part price. Production molds run from about $3,000 for a simple aluminum tool to $100,000 or more for hardened multi-cavity steel. Part prices run from pennies to $5 or more. Volume decides which number matters, because the mold cost is spread across every part you make.
You have a part, a CAD file and a target price, and the quotes coming back do not agree with each other. One molder quotes a low mold price and a high part price. Another does the opposite. Pick wrong and you either pay for a tool you will never wear out, or you lock in a part price that eats your margin for years.
Injection molding cost is not one number. It is two numbers that trade against each other, and your annual volume sets the exchange rate. This guide walks through both: how a molder builds a part price from material, press time and labor, with a worked example you can copy into a spreadsheet, and how a mold’s price spreads across 5,000, 50,000 and 500,000 parts. You will also see what drives the mold price, what hides inside an overseas quote, and how to ask for quotes that line up side by side.
The figures are the ranges Legacy Molding publishes plus industry sources, and they are ranges on purpose. Your resin, your geometry and your volume move every one of them.
What are the two numbers in every injection molding quote?
Every injection molding quote comes down to a mold price you pay once and a part price you pay per piece. The mold is a block of steel or aluminum with your part cut into it. The part price is what it costs to fill that mold, cool it, open it and box what comes out. Everything else on a quote is a detail of one of those two.
The mold is a fixed cost. Legacy Molding’s published range runs from about $3,000 for a simple single-cavity aluminum tool to $100,000 or more for a complex multi-cavity hardened steel mold. A Class 101 production mold, rated by SPI/PLASTICS for one million cycles or more, typically lands between $25,000 and $80,000. You pay it before the first good part ships, and you should own it. Get that in writing.
The part price is a variable cost. Typical ranges run from $0.10 to $5 or more per piece, depending on size, complexity, material and volume. High-volume runs of 100,000 parts and up often reach pennies per part. The part price never goes to zero, but it falls as the run gets longer and the setup gets spread thinner.
The mold is fixed. The part is variable. Your annual volume is the exchange rate between them, and it is the first thing a molder needs to know.
Quotes stop comparing when two molders assumed different things, such as a two-cavity tool against an eight-cavity tool, or 20,000 parts a year against 200,000. Before you compare any numbers, make sure the assumptions match.
How is injection molding cost per part calculated?
A part price is material plus press time divided by cavities, plus labor, secondary operations, packaging and the molder’s margin. Every molder builds it a little differently, but the pieces are the same:
- Material. Part weight plus a share of the runner and scrap, times the resin price per pound.
- Press time. The hourly rate of the press, divided by how many parts the mold makes per hour. Parts per hour is cavities times shots per hour.
- Labor. Any work beyond the press operator: inspection, degating, packing, loading inserts.
- Secondary operations. Pad printing, assembly, drilling, heat staking, anything after the mold opens.
- Margin. The molder’s profit, usually a percentage on the subtotal.
Two of those inputs move around. Plastics Technology reported ABS up 15 to 20 cents a pound in April and May 2026 and polypropylene down 7 cents in May, so a material price is good for a window, not forever. Press rates vary by press size, by region, and by whether an operator is included. Ask for both as line items.
As Jim Fattori put it in Plastics Technology’s quoting series, molders do not sell plastic parts. They sell press time. That is why cycle time matters so much, and cycle time is mostly cooling. A thinner, more uniform wall cools faster and is a cheaper part for the life of the tool.
Worked example (illustrative math, not a quote). Take a 50 gram ABS housing in a four-cavity steel tool at a 30 second cycle. The resin price, press rate and labor below are assumed round numbers chosen to show the method. Your molder’s numbers will differ.
| Input | Assumption | Per-part math |
|---|---|---|
| Material | 50 g = 0.11 lb at an assumed $1.00 per lb, plus 10 percent for runner and scrap | about $0.12 |
| Press time | 30 s cycle = 120 shots per hour x 4 cavities = 480 parts per hour, at an assumed $50 per hour with operator | about $0.10 |
| Labor and packaging | Inspection and boxing at an assumed $0.03 | $0.03 |
| Secondary operations | None | $0.00 |
| Subtotal | $0.25 | |
| Margin | Assumed 20 percent | $0.05 |
| Part price before tooling | about $0.30 |
Now watch what moves it. Cut the cycle to 24 seconds and press time per part drops to about $0.08. Double the cavities to eight and it drops to about $0.05, but the mold costs more. Switch to glass-filled nylon or PEEK and the material line can climb from pennies to dollars, and a hand-loaded metal insert can push labor past press time.
How does volume change the price per part?
Volume changes the price because the mold cost is divided by the number of parts it makes, so the same tool adds $8.00 to each of 5,000 parts and 8 cents to each of 500,000. The molding cost per part barely moves. The amortized tool cost moves enormously. This table uses the $0.30 part from the example above and a $40,000 four-cavity steel tool, which sits inside the typical Class 101 range.
| Annual volume | $40,000 mold spread per part | Molding cost per part (example) | Total per part |
|---|---|---|---|
| 5,000 | $8.00 | $0.30 | $8.30 |
| 50,000 | $0.80 | $0.30 | $1.10 |
| 500,000 | $0.08 | $0.30 | $0.38 |
Illustrative figures. The mold cost is spread over one year of volume. Real quotes spread tooling differently, or bill it up front.
The 5,000 part row shows why no one should buy a Class 101 tool for a 5,000 part program. Run the same part in a single-cavity aluminum tool priced at, say, $8,000, and press time per part rises to about $0.42 because the tool makes 120 parts an hour instead of 480. The part lands near $0.68, the tool adds $1.60, and the total is about $2.30. That is far better than $8.30, and it is why molders ask about volume before anything else.
Three things to take from the table:
- Below roughly 10,000 parts, tooling dominates. Spend less on the tool, even if the part costs more.
- Between 10,000 and 100,000 parts, both numbers matter, and the quote assumptions must match.
- Above 100,000 parts, the part price dominates. A second set of cavities or a faster cycle is worth more than any tooling discount.
Volume also moves the molding cost itself, though less. A long run spreads setup and first-piece inspection over more parts, which is why most custom molders set an effective minimum of 500 to 1,000 parts per run and high-volume programs start at 10,000 and up. Legacy Molding runs production from 100,000 to 10 million or more parts a year on presses under 200 tons, which covers parts up to about the size of a hand-held housing or a bracket.
At the other end, the mold is the worst money you can spend at 100 parts. If you are still iterating, the post on injection molding versus 3D printing covers the break-even math and bridge tooling. If the part is large, thin and shallow, the comparison of thermoforming versus injection molding gives the breakpoints.
What drives injection mold cost?
Mold cost is driven by cavity count, part geometry, surface finish, mold steel grade, and the side actions needed to form undercuts. Cycle time and material matter too, because a fast cycle needs more cooling lines and an abrasive glass-filled resin needs harder steel. The full breakdown lives in the spoke post on what a production injection mold costs. The short version:
- Cavities. Each cavity is more cutting, more polishing and more cooling. Two to 64 parts per cycle is the normal span.
- Geometry. Undercuts need slides or lifters. Deep ribs need EDM. Thin walls need venting and tighter steel.
- Finish. A textured or high-polish cosmetic surface costs hours of hand work. A hidden surface costs nothing extra.
- Steel. Prehardened P20 is cheaper to cut than hardened H13 or S7, and aluminum is cheaper still, but each lasts a different number of cycles.
- Runner system. A hot runner adds cost up front and saves material and cycle time on long runs.
Lead time follows the same drivers: 2 to 4 weeks for a simple single-cavity mold and 6 to 12 weeks from design approval to first article for a complex multi-cavity production mold, on Legacy Molding’s published schedule. Mold design and DFM happen in-house at Legacy Molding, and the steel is cut by vetted tooling partners. See the injection mold tooling and transfer page for what a tool quote should itemize.
What hidden costs show up in an overseas quote?
An overseas piece price leaves out freight, duty and tariffs, the inventory you carry across an 8 to 16 week lead time, quality travel, and the cost of a bad lot you cannot return quickly. The piece price on the quote is real. It is just not the whole number. Ask for a landed cost per part instead, built from these lines:
- Freight. Ocean or air, port to door, plus any expedite when a shipment slips.
- Duty and tariff. The rate depends on the product code and country of origin, and it has changed more than once in recent years.
- Inventory carrying. Longer lead times mean bigger safety stock, which is cash on a shelf.
- Quality travel. Someone has to approve the first article and sort the first bad lot.
- Tooling location and IP. A mold overseas is hard to move and hard to protect.
Domestic production parts from Legacy Molding ship in 2 to 6 weeks, against 8 to 16 weeks overseas, with no tariff exposure and the tool within driving distance. That does not make domestic cheaper on every part, because very high labor content still favors low-wage regions. The landed-cost comparison for a Southwest OEM is worked through in the post on injection molding in Mexico versus Arizona, and the reshoring and nearshoring page covers how a tool comes home.
How do you get injection molding quotes that compare?
You get comparable quotes by sending every molder the same package and asking for the same line items back. Here is a call Legacy Molding gets most months: a founder has three quotes for the same housing, the mold prices span a factor of four, and nobody can tell why. When Brent Hanke walks through the quotes, the reason is almost always in the assumptions. One shop quoted a Class 103 tool and another a Class 101, one assumed 25,000 parts a year and another 250,000, and only one mentioned a first article inspection.
Send the same package to everyone:
- A STEP, IGES or SolidWorks file, plus a drawing with tolerances called out only where they matter.
- The material, or the requirements if you want the molder to recommend one.
- Annual volume and the expected life of the program.
- Surface finish, color and any secondary operations.
Ask every quote to state:
- Cavity count, mold class or expected life, and the steel.
- The cycle time and press size the part price assumes.
- Material grade and the price basis, so a resin move does not surprise you.
- What inspection ships with the first lot. At Legacy Molding that is a first article inspection report and the resin supplier’s material certs on every new or transferred tool.
- Who owns the mold, and the lead time to first article.
Legacy Molding returns quotes in 24 to 48 business hours, or 3 to 5 business days when the part needs a deeper DFM review. Brent Hanke’s rule is that no tool gets cut before that review, because a wall or draft fix on paper costs nothing and the same fix in steel costs weeks. The production injection molding page describes what happens after the quote is accepted.
Comparing injection molding with other processes
If you are still deciding how to make the part, these comparisons use the same cost method as this guide.
- Thermoforming vs injection molding
- Injection molding vs 3D printing
- Blow molding vs injection molding
- Compression molding vs injection molding
- Die casting vs injection molding
- CNC machining vs injection molding
- Urethane casting vs injection molding
- Injection molding vs extrusion
Frequently Asked Questions
How much does injection molding cost per part?
Typical injection molding cost per part runs from about $0.10 to $5 or more. Small, simple parts in commodity resins at volumes above 100,000 often reach pennies apiece. Large or complex parts in engineering resins, with inserts or secondary operations, sit at the high end. The mold cost is separate and is spread across the parts you make.
How much does an injection mold cost?
A simple single-cavity aluminum mold starts around $3,000. A complex multi-cavity hardened steel mold can pass $100,000. A Class 101 production mold rated for one million or more cycles typically costs $25,000 to $80,000. Cavity count, geometry, surface finish and steel grade set the price.
Why is injection molding so expensive to start?
Injection molding is expensive to start because the mold has to be cut before a single part exists, and that tool is precision machined steel or aluminum built to hold thousands of pounds of pressure for hundreds of thousands of cycles. Once it exists, each additional part costs very little, which is why the process gets cheap at volume.
What is the minimum order for injection molding?
There is no universal minimum, but most custom molders set an effective minimum of 500 to 1,000 parts per run because setup and first-piece inspection cost the same for a short run as a long one. High-volume programs usually start at 10,000 parts and up. Ask your molder what run size their part price assumes.
Conclusion
Three things to carry into your next quote. The mold is fixed and the part is variable, and your annual volume decides which one matters. A part price is material plus press time divided by cavities plus labor and margin, so cycle time, cavity count and resin are the levers. And quotes only compare when the assumptions match, so send the same package and ask for the same line items.
Do that and injection molding cost stops being a mystery and becomes a spreadsheet you control. Legacy Molding in Phoenix will fill in the real numbers for your part with a DFM review attached. Send your CAD and annual volume for a quote with DFM notes, or call Brent Hanke at 480-256-9773.
Sources
- Plastics Technology, July 2026: Flat-to-Down Price Trajectory for Volume Resins: https://www.ptonline.com/articles/july-2026-flat-to-down-price-trajectory-for-volume-resins
- Plastics Technology, Get Better at Quoting Injection Molded Parts: Part 1 (Jim Fattori): https://www.ptonline.com/articles/get-better-at-quoting-injection-molded-parts-part-1
Brent Hanke | Legacy Molding | 480-256-9773 | b.hanke@legacy-molding.com
Brent Hanke is the owner of Legacy Molding, a custom plastic injection molder in Phoenix, Arizona, producing parts for OEMs across the Southwest and the country.
Have a part like this to quote?
Send the CAD and annual volume. A Phoenix engineer replies within one business day with pricing and DFM notes.